TYPE3’s map data identifies Alpha Digital Campus as a PowerBridge wholesale/build-to-suit campus at 1073 County Road 101 in Coyanosa, with Announced status and 0 MW. LandBridge announced a lease-development agreement for a West Texas campus on up to approximately 3,400 acres in Reeves County, with up to 2 GW of initial co-located generation under development. PowerBridge and Liberty Energy describe Alpha as the associated planned 2 GW powered campus, with a 300 MW initial generation phase and first power targeted for late 2027.
These are generation and development-scale claims. They do not establish data-center IT load, contracted customer load, grid interconnection, operating status, or available capacity. TYPE3’s Coyanosa/County Road 101 identity should be retained, while the Reeves County lease description and exact parcel boundary should be reconciled before publication.
Keep Alpha Digital separate from other PowerBridge, LandBridge, Permian Basin, and West Texas projects. Do not use generation nameplate, acreage, or first-power timing as a proxy for current site demand. Request the site entity, parcel, permits, generation configuration, utility/interconnection status, building schedule, and customer commitments.
The partner materials describe a powered-campus model in which generation, electrical infrastructure, and data-center pads may be developed in stages. That commercial architecture is informative but does not prove that TYPE3’s map data pin is the final parcel or that any customer load has been contracted. Editorial copy should retain both the address reconciliation and the staged-delivery caveat.
Questions
What is Alpha Digital Campus?
It is PowerBridge’s planned West Texas powered digital campus, listed near Coyanosa at 1073 County Road 101. LandBridge and Liberty Energy describe related land and power-development arrangements.
How much power will Alpha have?
Partner materials report up to 2 GW of co-located generation and a 300 MW initial phase. Those are generation figures, not current data-center demand or available IT capacity.
Is Alpha Digital Campus operating?
No. TYPE3’s map data says Announced, and partner reporting targets first power in late 2027. Operation and energization remain unverified.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.