Lancium Fort Stockton Clean Campus
Overview
Lancium's Fort Stockton Clean Campus sits on about 110 acres in Pecos County. TYPE3’s map data lists Lancium LLC as operator and the site as operating, with Bitcoin mining and other high-performance-computing workloads. Its 325 MW field describes planned full-campus scale, while TYPE3’s map data cautions that current energization may be much smaller and uncertain.
In September 2021, Lancium said the first Clean Campus would begin with a facility of more than 100,000 square feet and a 25 MW stage targeted for Q1 2022, with the broader campus planned to reach 325 MW by the end of 2022. That 25 MW target applied to the initial stage, not the entire site. Lancium presented the campus as an ERCOT Controllable Load Resource using Lancium Smart Response, a design intended to adjust computing demand when grid conditions change.
The announcement documents the operating model and planned build, not an independent reading of current load or proof of market performance. The 325 MW remains a full-campus plan, while 25 MW is an initial-stage target from 2021. Neither figure is a current measurement, and TYPE3’s Operating label does not resolve what portion of the campus is energized. A current Lancium, ERCOT, utility, or regulatory update is needed before the site is described as fully built or the verification state changes.
Questions
What is Lancium's Fort Stockton campus?
It is a flexible-computing site intended for Bitcoin mining and other high-throughput workloads in Pecos County.
How large is the campus?
Lancium announced a planned full-campus capacity of 325 MW, starting with a 25 MW stage. Those figures do not confirm current energized load.
How does the site interact with ERCOT?
Lancium designed it as a Controllable Load Resource, so computing demand can be adjusted in response to grid conditions.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.