CyrusOne SAT5 — San Antonio, Texas
Overview
TYPE3’s map data identifies CyrusOne SAT5 - San Antonio as a wholesale/build-to-suit colocation facility operated by CyrusOne Data Centers at 14719 Omicron Drive. Its inventory status is Announced and its MW field is 0. Those values remain the authoritative map data state for this batch, even though newer or differently scoped public records add context.
A Texas Commission on Environmental Quality permit-by-rule registration dated June 25, 2024 names CyrusOne LLC at 14719 Omicron Drive and describes the project/unit as “Sat5 Sat6.” The record is useful for facility identity and permitted emissions/backup-generation context; it does not establish IT load, utility service, energization, or customer availability. CyrusOne’s 2023 sustainability report says SAT5 became built out in 2022, which conflicts with TYPE3’s Announced state and should not be silently normalized. A secondary DataCenterMap listing also places SAT5 at 14719 Omicron and identifies it as part of the San Antonio-Omicron Campus.
CyrusOne SAT5 remains separate from SAT6, the broader Omicron campus, and nearby Vantage TX11/TX12 facilities. The TCEQ permit and historical built-out statement do not establish a current power figure. Operating status, critical-IT load, utility and generator layers, customer/leased scope, and available capacity remain unconfirmed by CyrusOne. The permit does not establish commercial readiness.
Questions
What is CyrusOne SAT5?
CyrusOne SAT5 is a CyrusOne wholesale/build-to-suit data-center record at 14719 Omicron Drive in San Antonio. It is a child facility within the Omicron-area development cluster, not the entire CyrusOne San Antonio campus.
How much power does CyrusOne SAT5 use or plan to use?
TYPE3’s map data records 0 MW, and no current critical-IT or available-capacity figure was verified. A TCEQ record supports backup-generation permitting context but does not state IT load. Do not infer power from the permit.
Is CyrusOne SAT5 operating?
TYPE3’s map data says Announced, while CyrusOne’s 2023 sustainability report says SAT5 was built out in 2022. Treat operating status as conflicting until CyrusOne confirms energization, current load, and customer-ready capacity.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.