CyrusOne SAT9 — San Antonio, Texas
Overview
TYPE3’s map data lists CyrusOne SAT9 - San Antonio under CyrusOne Data Centers, with `Announced` status, 0 MW, and 14815 Omicron Drive. TDLR TABS2024005161 uses facility name SAT 8 & 9 at 14815 Omicron Drive, 279,730 square feet, four data halls plus admin space, April 2024 to December 2025. The listed $15 million estimated cost is far below later construction reporting and is treated as an incomplete filing figure, not project economics. DCD’s 2023 story on the same filing matches the two-story, four-hall description.
CyrusOne’s January 29, 2025 release says the company broke ground on its fifth San Antonio campus in Texas Research Park: two buildings, 276,000 square feet, 36 MW IT capacity, and roughly $1 billion of San Antonio capital to date; the capital figure is market investment, not SAT9 MW. Contractor copy describes SAT 08 & 09 as about 277,333 square feet and 35–36 MW. Square-footage figures therefore conflict at 276,000 versus 277,333 versus 279,730, and MW is stated for the pair, not SAT9.
SAT9 remains linked to SAT8 and the Omicron campus, but unmerged. The 36 MW, 279,730 square feet, and $1 billion figures are not placed on this child alone. The mapping of 14815 versus 14677, hall count, energization, and available IT remains unconfirmed before any map data change.
Questions
What is CyrusOne SAT9?
It is one of two buildings in CyrusOne’s fifth San Antonio campus on Omicron Drive. TYPE3’s map data pins SAT9 at 14815 Omicron Drive; SAT8 is the sibling at 14677 Omicron Drive.
Does SAT9 have 36 MW?
CyrusOne stated 36 MW for the two-building campus. TDLR describes four data halls for the combined SAT 8 & 9 filing. Do not repeat 36 MW as SAT9-only IT.
Is SAT9 operating?
Groundbreaking and a TDLR construction window are documented. Current energized load and availability were not verified. Keep Announced / 0 MW.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.