DataBank DFW11 — Red Oak, Texas
Overview
DFW11 is one of the buildings in DataBank’s Red Oak campus development in Ellis County. DataBank’s current facility page identifies the record as DFW11 at 3320 Batchler Road, Red Oak, Texas 75154, and describes a two-story building with 200,000 square feet of data-center space. The page assigns DFW11 a 60 MW critical IT load label and describes N+1 power and cooling, 45 kW-plus air density, 100 kW-plus liquid density, cabinets and cages, and HPC compatibility. Onsite carriers are listed as to be determined.
The same page places the building inside a larger campus plan: Phase 1 includes four buildings and a 400 MW substation capable of delivering up to 240 MW of critical IT power, while full campus development is described at 480 MW across eight buildings. Those are campus and phase layers, not proof that DFW11 is energized, occupied, or selling 60 MW today. DataBank’s campus materials describe the Red Oak build as under development and target future readiness. TYPE3’s Announced/0 MW state remains in the audit trail until an authoritative construction or operating update supports a change.
This page supports hyperscale, HPC, and high-density colocation research, especially when buyers need to distinguish a single building from the Red Oak parent campus. A dated source comparison or diligence request is the appropriate commercial CTA. The 60 MW label is not available capacity, measured consumption, or a binding delivery commitment.
Questions
What is DataBank DFW11?
It is a planned DataBank building in the Red Oak campus, identified at 3320 Batchler Road.
How much power is planned for DFW11?
DataBank publishes a 60 MW critical-IT label, but that is not current available or measured load.
Is DFW11 operating?
Public sources reviewed for this record establish a planned facility, not current operations or customer inventory.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.