DataBank DFW9 Red Oak Data Center
Overview
DFW9 is the first address-specific building in DataBank’s Red Oak campus sequence and must remain separate from DFW10, DFW11, and DFW12. DataBank’s campus page identifies DFW9 at 3080 Batchler Road, Red Oak, Texas 75154, with 200,000 IT square feet, 60 MW of critical IT load, and one on-site carrier. The operator positions the Red Oak buildings for cloud, enterprise, and AI/HPC workloads, with universal data-hall design and support for high-density air and liquid cooling.
Status evidence is mixed in an important way. DataBank’s April 2026 financing announcement says the first three facilities, DFW9, DFW10, and DFW11, had already been leased and that financing would fund their construction. DataBank’s campus and facility materials continue to describe the buildings as part of a development, and a lease announcement is not proof of construction completion, energization, or live customer operations. “Planned,” “under development,” or “leased development” remains appropriate unless a current commissioning or service-ready source changes the state.
The 60 MW number is a published critical IT-load design figure. It must not be treated as current consumption, utility service, available inventory, or the campus total. DataBank separately markets a Red Oak campus with multiple buildings and larger substation/full-buildout figures; those layers stay at campus level. DFW9’s 3080 Batchler Road address should appear in the canonical slug, title support, H1, and sibling links. The page can target high-intent DFW9 and Red Oak data-center searches while making the planned-versus-operating distinction the first editorial fact.
Questions
What is DataBank DFW9?
DFW9 is a DataBank Red Oak campus building at 3080 Batchler Road in Red Oak, Texas. It is one of the first Red Oak buildings and should be linked as a distinct sibling page from DFW10, DFW11, and DFW12.
How much power does DataBank DFW9 use or plan to use?
DataBank publishes 60 MW of critical IT load for DFW9. The figure is a planned/design capacity label and should not be rewritten as current consumption, utility service, or customer-available power.
Is DataBank DFW9 operating?
Operation is not verified. DataBank reported that DFW9 was among the first buildings financed and leased in 2026, but leasing and construction financing do not prove energization, commissioning, or live availability.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.