Edged DFW01-1 — Irving, Texas
Overview
TYPE3’s map data records Edged Dallas-Fort Worth DFW01-1 in Irving, with Edged Energy as operator, Announced status, and 0 MW. Edged’s current Dallas location page describes DFW01-1 and DFW01-2 as a two-facility Irving campus at 300 North Loop 12, with 48 MW of campus capacity, a 15-acre campus, redundant A+B distribution, N+1 UPS and generators, and waterless cooling. The public page groups the two buildings rather than publishing a DFW01-1-only availability schedule.
Edged’s January 2025 grand-opening release provides a dated first-facility record at 505 North Wildwood Drive and says that building delivers 24 MW of critical capacity. Its January 2026 expansion release describes a second 24 MW facility approved for the Irving campus. Address and building labels therefore need careful canonicalization: 505 North Wildwood is the first-facility address in the release, while the current location page uses 300 North Loop 12 for the dual-site campus. Do not add the two 24 MW statements as current vacancy.
Position this page around AI-ready, waterless, high-density infrastructure and Irving location intent. Ask Edged to confirm which address maps to DFW01-1, the building’s commissioned status, critical-IT allocation, tenant model, and current orderable capacity. Keep DFW01-1 separate from Edged’s Fort Worth DFW02-1 and from unrelated Irving campuses.
Questions
Where is Edged DFW01-1?
It is part of Edged’s Irving DFW01 campus; address mapping should be confirmed against the current operator record.
Is DFW01-1 a 48 MW facility?
The current Edged page lists 48 MW for the two-facility Irving campus, not necessarily one building.
Is 24 MW available to lease?
The 24 MW figure is critical capacity described for the first facility, not a current vacancy promise.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.