Edged Dallas-Fort Worth DFW01 Campus — Irving, Texas
Overview
TYPE3’s map data lists Edged Dallas-Fort Worth DFW01 Campus in Irving with Edged Energy as operator, Announced status, and 0 MW. The note calls the campus a 24 MW Irving hall with waterless cooling; that is first-building paste. Live coordinates are 32.81717, -96.91876. First-party copy now states two facilities will support DFW at hyperscale with 48 MW of capacity, dual-site configuration, and the Loop 12 address.
DFW01-1’s grand-opening material uses 505 N Wildwood Drive, 24 MW, 168,610 square feet, and 16 January 2025. DFW01-2 is the second 24 MW building; Irving Council approval January 2026 and a Q2 2026 groundbreaking target appear in prior campaign sourcing. TDLR TABS2025020774 is a 32,700-square-foot / $3.1 million interior fit-out at 505 N. Wildwood; not campus MW. 48 MW is campus critical-capacity design, not vacancy and not a license to sum children again on the parent page.
Keep DFW01 Campus off DFW02 Fort Worth (this batch) and off Prime DFW04. Edged has not published current energized load versus the 48 MW design, which building is in service, or what is quoteable. Preserve Announced / 0 MW as TYPE3’s map data state. Do not publish campus critical load as vacancy or as extra to the child pages.
Questions
Is the campus 24 MW or 48 MW?
Edged’s current page says 48 MW across two Irving facilities. 24 MW is the first-hall figure. Do not add 24+24+48.
Does this page include Fort Worth?
No. Fort Worth is DFW02 / Outpost. This parent is Irving only.
Is 48 MW vacant capacity?
No. It is campus critical-capacity design. Current saleable inventory needs Edged confirmation. TYPE3’s map data records 0 MW.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.