Edged DFW01-2 — Irving, Texas
Overview
TYPE3’s map data lists Edged Dallas-Fort Worth DFW01-2 in Irving, with Edged Energy as operator, Announced status, and 0 MW. Edged's current Dallas location page identifies a two-facility campus at 300 North Loop 12 and describes 48 MW across the campus, a 15-acre site, redundant A+B distribution, N+1 UPS and generators, and waterless cooling. The page presents DFW01-1 and DFW01-2 together rather than publishing a building-specific availability schedule for buyers.
Edged's January 2026 expansion release identifies the second Irving facility as a 24 MW addition. The dated release should be retained as the source for the child-level figure, while the current location page supplies the broader campus context. Do not treat the two 24 MW building figures or the 48 MW campus figure as current uncontracted capacity. TYPE3’s Announced/0 MW state remains visible.
Use this record for buyers researching high-density, waterless-cooled infrastructure in Irving. Ask Edged to confirm the canonical street address, commissioning milestone, critical-IT allocation, tenant model, and currently orderable capacity. Keep DFW01-2 separate from DFW01-1 and from Edged's other Dallas-area records. The first-building release uses 505 North Wildwood Drive, while the current campus page uses 300 North Loop 12; that address mapping requires explicit confirmation.
Questions
What is Edged DFW01-2?
It is the second facility in Edged's two-building Irving Dallas campus.
Does DFW01-2 have 48 MW?
No. 48 MW is the current page's two-facility campus figure; the dated child figure is 24 MW.
Is 24 MW available to lease?
No availability conclusion follows from the announced facility-capacity figure.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.