QTS Irving Mega Campus — Irving, Texas
Overview
TYPE3’s map data lists QTS Irving Mega Campus as an operating wholesale/build-to-suit facility in Dallas County, with QTS Data Centers (Blackstone) as operator, 147 MW, and approximately 700,000 square feet across six buildings at Longhorn Drive. QTS’s current Irving page confirms the operating campus identity and lists six facilities, while describing more than 165 MW of critical campus capacity. QTS’s February 2024 Texas expansion update instead describes Irving as a 700,000-square-foot campus with more than 147 MW of critical power capacity.
The differing 147 MW-plus and 165 MW-plus figures are not silently reconciled here. They may reflect source dates, campus scope, or expansion updates. Neither figure proves current energized IT load, vacancy, or a customer-ready block. The current QTS page is strongest for present operator identity and campus configuration; the 2024 release supports TYPE3’s earlier capacity and square-footage framing. A building-specific quote is still required.
For buyers, target QTS Irving wholesale colocation, build-to-suit, and campus expansion searches. Keep the campus parent separate from individual QTS buildings and addresses. Request the specific building, critical-IT allocation, utility and UPS layer, generator-backed capacity, cross-connect options, and current availability. Do not add 147 MW and 165 MW, and do not present either as uncontracted capacity.
Questions
Where is QTS Irving Mega Campus?
QTS Irving Mega Campus is on Longhorn Drive in Irving, Texas, in Dallas County. QTS’s current location page identifies an operating campus with six facilities. Individual building addresses and service options should be confirmed for a specific deployment.
How much power does QTS Irving have?
TYPE3’s map data records 147 MW. QTS has also published 147 MW-plus and a newer 165 MW-plus critical-campus figure. These source-labeled campus figures are not current load or available customer power, and they should not be added together.
Is QTS Irving operating?
Yes. QTS currently presents Irving as an operating data-center campus. Operating status does not establish vacant capacity; customers should request a building-specific critical-IT allocation, utility layer, and commercial availability.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.