Rowan Cinco — Lytle, Texas
Overview
TYPE3’s map data lists Rowan Cinco as a wholesale/build-to-suit facility in Lytle, Texas, operated by Rowan Digital Infrastructure, with Announced status, 0 MW, and a location note at TX-132 and County Road 683. Rowan’s official August 2025 announcement says construction was beginning on the Cinco data-center campus near San Antonio, with 440 acres, a minimum $900 million investment in Medina County, 300 MW of hyperscale capacity, and expected full operation in 2027. Rowan’s portfolio material repeats the 300 MW and 2027 framing.
An AEP Texas announcement also describes a Cinco groundbreaking and 300 MW project, supporting the utility relationship, although its copy contains a location wording inconsistency. Quinbrook’s portfolio page describes Cinco 1 as a 300 MW project within AEP’s service area and distinguishes a broader 1 GW 2026–2030 power-capacity ambition. Those figures are not interchangeable: 300 MW is the reported campus/project scale, while 1 GW is a broader portfolio/future development claim.
Use the page for development discovery, with TYPE3’s Announced/0 MW state preserved. Keep the 440-acre campus, project phase, AEP service relationship, water-offset program, planned capacity, construction progress, and current operating load separate. Rowan Cinco is not Rowan Temple and should not inherit any other campus’s figures. Request exact parcel confirmation, permits, utility/interconnection evidence, energization milestones, critical-IT schedule, customer commitment, and availability before commercial publication.
Questions
What is Rowan Cinco?
Rowan Cinco is Rowan Digital Infrastructure’s planned hyperscale data-center campus near Lytle in Medina County. Rowan describes a 440-acre development and a 300 MW project scale; it is separate from Rowan Temple and other Rowan facilities.
How much power will Rowan Cinco have?
Rowan reports 300 MW of planned hyperscale capacity. That is a development-scale figure, not current metered load or available customer capacity. A separate 1 GW figure in Quinbrook material refers to broader future power capacity and must not be substituted.
Is Rowan Cinco operating?
No. Rowan says construction began and expected full operation is in 2027. TYPE3’s map data remains Announced and 0 MW, and current energization, commissioning, and customer-ready capacity were not independently verified.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.