Vantage TX12 — San Antonio, Texas
Overview
TYPE3’s map data identifies Vantage TX12 - San Antonio as a wholesale/build-to-suit colocation facility operated by Vantage at 17420 Omicron Drive. It preserves Announced status and 0 MW. Texas Department of Licensing and Regulation records provide stronger project detail but also show why the layers must remain separate. The shell project, TABS2026001234, describes a new two-story building with 432,800 gross square feet and up to 96 MW of critical IT capacity, with a scheduled construction period from October 2025 through August 2027.
A second TDLR record, TABS2026012091, covers a TX12 TFO fit-up at the same address. It describes a tenant buildout of 96 MW data modules in 174,812 square feet, with a later completion date extending into March 2028. The shell, fit-up, tenant, critical-IT, construction, and operating layers are not interchangeable. The filings establish a planned project and its design scope; they do not prove energization, metered load, utility delivery, or vacant customer capacity.
Keep TX12 separate from Vantage TX11 at 14720 Omicron Drive, even though the projects share the TX1 campus context and nearby addresses. Use the page for development-intent searches and label the 96 MW number as filed critical-IT design capacity. Before an availability claim, request Vantage’s current construction milestone, utility/interconnection status, energized date, critical-IT allocation, backup-generation layer, customer/lease status, and remaining capacity.
Questions
What is Vantage TX12?
Vantage TX12 is a Vantage wholesale/build-to-suit data-center project at 17420 Omicron Drive in San Antonio. It is associated with the TX1 campus context but is a separate building record from TX11 at 14720 Omicron Drive.
How much power will Vantage TX12 have?
TDLR filings describe up to 96 MW of critical IT capacity and a later 96 MW tenant-module fit-up. That is filed design/construction scope, not current metered load, utility entitlement, or available customer capacity.
Is Vantage TX12 operating?
TYPE3’s map data status is Announced, and the reviewed TDLR records describe shell and tenant fit-up work with future completion dates. No source reviewed verifies energization or commercial operation. Do not label TX12 operating without current Vantage evidence.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.