Overview
TYPE3’s map data lists Rowan Temple AUS02 (Building 1) in Temple under Rowan Digital Infrastructure, with `Announced` status and 0 MW. Rowan’s official Temple portfolio describes a 300 MW hyperscale campus on approximately 700 acres. Its construction announcement says work is underway, power is secured through an Oncor partnership, and operations are expected in 2027. These are parent-campus facts and do not establish a building-specific electrical allocation.
TYPE3’s map data note associates the row with a $700 million, 300 MW campus. That context is useful, but the reviewed first-party sources do not map the AUS02 Building 1 label to a final permit, building area, customer, or measured load. Rowan’s Temple projects page instead describes six buildings across Project Temple, Project Stampede, and Project Ranger, with different approval and construction states. Building 1 should therefore remain a child record and must not receive the full campus figure.
Rowan Temple AUS02 Building 1 has an evidence boundary: its parcel, building name, permit, phase, construction status, customer assignment, energization date, and critical-IT capacity are not yet confirmed. TYPE3’s map data remains `Announced` / `0 MW`, and the child links to Rowan Temple AUS02 Campus without double counting the parent’s 300 MW. A building schedule from Rowan is needed to establish any allocation.
Questions
What is Rowan Temple AUS02 Building 1?
It is TYPE3’s child record for a Rowan Digital Infrastructure data-center project in Temple. Rowan’s public pages describe the larger Temple campus but do not identify a separate Building 1 capacity or commissioning record.
Does Building 1 have 300 MW?
No building-specific allocation is verified. Rowan reports 300 MW for the Temple campus. That parent figure should not be copied onto Building 1 or added again to the campus row.
Is Rowan Temple AUS02 Building 1 operating?
The parent development is under construction, with operations expected in 2027. The reviewed sources do not establish Building 1 commissioning, energized load, or current customer availability.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.