Rowan Temple AUS02 Building 2 — Temple, Texas
Overview
TYPE3’s map data lists Rowan Temple AUS02 (Building 2) in Temple under Rowan Digital Infrastructure, with `Announced` status and 0 MW. Rowan’s official Temple portfolio describes a 300 MW hyperscale campus on approximately 700 acres in Central Texas. Rowan’s January 2026 announcement says construction was underway, power had been secured through an Oncor partnership, and operations were expected in 2027. These sources establish a substantial parent project but do not assign the full 300 MW to a building named AUS02.
TYPE3’s map data note reports a 500,000-square-foot expansion. That building-level area remains a reported inventory attribute because the reviewed first-party pages do not map the AUS02 label to a specific approved building, permit, or phase. Rowan’s Temple projects page instead describes six buildings across Project Temple, Project Stampede, and Project Ranger, with different approval and construction states. That topology matters: Building 2 should not become a duplicate of the Rowan Temple AUS02 Campus row or inherit the entire parent capacity.
Rowan Temple AUS02 Building 2 is useful as a child search record when its identity is stated alongside what is and is not verified. Its project name, parcel, permit, construction milestone, customer assignment, energization date, and critical-IT allocation still require confirmation before TYPE3’s map data changes. Link it to the Rowan Temple campus and preserve the parent/child distinction in the CMS.
Questions
What is Rowan Temple AUS02 Building 2?
It is TYPE3’s child record for a Rowan Digital Infrastructure data-center expansion in Temple. The row reports 500,000 square feet, but the reviewed official sources describe the broader Temple campus rather than a separately named AUS02 building.
Does Building 2 have 300 MW?
No building-specific allocation is verified. Rowan reports a 300 MW Temple campus on roughly 700 acres. That parent figure should not be copied onto Building 2 or added again to the campus record.
Is Rowan Temple AUS02 Building 2 operating?
The parent campus is under development, with Rowan expecting operations in 2027. The reviewed evidence does not establish Building 2 commissioning, energized load, or available customer capacity.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.