Rowan Temple AUS02 Campus — Temple, Texas
Overview
TYPE3’s map data lists Rowan Temple AUS02 Campus in Temple under Rowan Digital Infrastructure, with `Announced` status and 0 MW. Rowan’s official portfolio describes Temple as a 300 MW hyperscale campus on approximately 700 acres. Its January 2026 announcement says construction is underway, the project will serve a top global technology company as a long-term customer, power is secured through a partnership with Oncor, and operations are expected in 2027. Rowan’s Temple site also identifies multiple buildings and project groupings in east Temple.
This parent record should be the canonical campus-level page. The 300 MW figure is a planned campus capacity statement, not current metered IT demand, and it must not be copied into or added again from Building 2 or other child rows. Rowan’s projects page describes six buildings across Project Temple, Project Stampede, and Project Ranger with different approval and construction states, which makes a flat inventory merge especially risky.
Rowan Temple AUS02 Campus is presented with a clear status trail covering approval/development activity, construction, expected operations, and unknown current load. Its final building topology, customer allocation, energization dates, critical-IT capacity by building, and current commercial terms still require confirmation before TYPE3’s map data baseline changes. Parent-to-child links make the relationship explicit without double counting.
Questions
What is Rowan Temple AUS02 Campus?
It is Rowan Digital Infrastructure’s parent campus record for a large hyperscale development in Temple, Texas. Rowan describes approximately 700 acres and 300 MW of planned capacity across multiple buildings and project groupings.
Is the 300 MW figure current load?
No. Rowan presents 300 MW as campus capacity for the development. The reviewed sources do not provide a current metered IT-load figure or authorize adding 300 MW to the child-building rows.
When will Rowan Temple operate?
Rowan’s public materials say operations are expected in 2027. That target is not a certificate of occupancy, commissioning record, or proof of current customer availability.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.