Google Thelma Campus — Haskell County
Overview
Google Thelma is the southern Haskell County hyperscale campus at 10357 Loop Road. TYPE3’s map data lists site-level coordinates, 0 MW, and a DataCenterMap seed, while current filings provide stronger project evidence. TDLR project TABS2025019833, THM1A / Data Center 1, registers a 280,000-square-foot, $350 million new data center at 10357 Loop Road, Haskell, 79521, with a submitted start of 18 June 2025 and completion of 16 April 2027. Homebound Group LLC is the owner, and the filing contact is Conner Conrad Morrow. TDLR TABS2026007451, THM2A / Data Center 2, registers a second one-story building at the same THM campus: 350,000 square feet, $350 million, start 1 December 2025, completion 15 March 2028. Its print lists ZIP 75921, which is the wrong Texas ZIP for Haskell.
July 2026 reporting places Thelma in southern Haskell County and Journey at 1362 Red Creek Road in the north. Abilene Reporter-News quoted Conner Morrow, Google’s operations manager for the first two Haskell data centers, naming those campuses Thelma and Journey. That identifies the campuses but does not disclose Google MW. Aterio’s five-building wastewater reading and ~440 MW full-buildout estimate remain tracker math. Intersect Quantum’s 640 MW solar and 1.3 GWh battery system is co-located generation and storage for a Haskell Google campus, not Thelma IT load.
Thelma is the southern campus in Google’s two-site Haskell County development. Journey at 1362 Red Creek Road is the northern campus, while Ascendant/Ranger, Red Oak, and Midlothian are separate facilities. The evidence supports construction/registered status, not operation.
Questions
What is Google Thelma Campus?
It is the southern Haskell County data-center campus at 10357 Loop Road, filed as THM1A and THM2A by Homebound Group LLC and identified by a Google operations manager as one of the first two Haskell campuses.
How much power will Thelma use?
No first-party IT-load figure is published. Aterio’s ~440 MW figure is a five-building buildout estimate. Quantum’s 640 MW is solar generation, not campus IT.
Is Thelma the same as Google Haskell County Data Centers?
Thelma is one of two Google campuses identified in Haskell County. Journey at 1362 Red Creek Road is the other campus.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.