Vantage Frontier Campus — Abilene Area, Texas
Overview
TYPE3’s map data identifies Vantage Frontier as a wholesale/build-to-suit campus in the Abilene market, with Announced status and 0 MW. Vantage’s official announcement places Frontier in Shackelford County and describes a $25 billion development across 1,200 acres with 10 data centers and 3.7 million square feet. Its data sheet reports 1.4 GW of critical-IT load at full development, multiple feeds, N+1 systems, and liquid cooling.
A TDLR Frontier project record identifies Vantage DC Abilene TX3 / Project Frontier at 246 PR 1604 Building 10, with a 344,796-square-foot new building, $945 million estimated cost, Project Registered status, and completion scheduled in 2027. That building layer is not the full campus figure. TYPE3’s TX-351/FM604 reference and Vantage’s Shackelford County designation should be retained together.
Keep Frontier separate from Vantage TX301/TX310 and unrelated Taylor County projects. The 1.4 GW number is full-campus critical-IT design scale, not current metered load, delivered utility power, or available capacity. Request the building stage, utility/interconnection evidence, energization, tenant commitments, and remaining capacity.
The official campus data sheet is strong evidence for planned scale and technical intent, while the TDLR record is stronger for one building’s filing identity and schedule. Those sources answer different questions. A customer-facing availability statement needs a specific building, delivery date, contracted load, and current operating evidence rather than the campus headline.
Questions
What is Vantage Frontier?
It is Vantage’s hyperscale campus in Shackelford County, marketed from the Abilene area and associated with TX-351/FM604. It is separate from other Abilene/Taylor County projects.
How much power will Frontier have?
Vantage reports 1.4 GW of critical-IT load at full development. That is design scale, not current energized load, delivered utility power, or availability.
Is Vantage Frontier operating?
TYPE3’s map data says Announced. Vantage says construction began and late-2026 first-building delivery was targeted, but current operation was not verified.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.