Vantage Frontier AI Data Center Campus, Shackelford County, Texas
Overview
Vantage Frontier is a large-scale AI campus with county-level map precision. TYPE3’s map data records Vantage Data Centers, Construction status, 1,400 MW, an announced year of 2025, and an operational target of 2026. Vantage’s August 2025 announcement describes 1.4 GW across 10 data centers, approximately 3.7 million square feet, 1,200 acres, and more than $25 billion in investment. Vantage says construction has begun and the first building is scheduled for delivery in the second half of 2026.
The 1.4 GW figure is planned campus capacity, not a reading of current consumption or full-campus energized load. The first-building delivery target is a separate milestone. Vantage’s North America locations page lists Shackelford County at 1,400 MW, while its design materials describe air and liquid cooling, ultra-high-density racks, and a closed-loop chiller system intended to reduce water use.
Public reporting connects Frontier with the Oracle/OpenAI Stargate expansion. That relationship needs its dated source and should not be treated as an unchanging tenant fact. The record can answer searches about Texas AI campus scale, liquid cooling, and power demand while preserving county precision. It does not establish a demand-response contract, telemetry completeness, curtailment performance, or full operation of the campus.
Questions
How large is Vantage Frontier?
Vantage announced 1.4 GW across 10 data centers on 1,200 acres, with approximately 3.7 million square feet. That is total campus scope, not proof that all 1.4 GW is energized.
Is Vantage Frontier part of Stargate?
Public reporting connects the campus with the Oracle/OpenAI Stargate expansion. The relationship should remain dated and source-linked rather than treated as an unchanging tenant fact.
When will Frontier be operational?
Vantage announced first-building delivery in the second half of 2026. The full campus timeline and current energized load require separate verification.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.