Vantage Frontier Campus (Stargate Shackelford) — Shackelford County, Texas
Overview
TYPE3’s map data lists Vantage Frontier Campus (Stargate Shackelford) in Abilene with Vantage Data Centers as operator, Announced status, and 0 MW. Live coordinates are 32.54286, -99.54651 at site precision. Vantage’s first-party page (vantage-dc.com) is the campus identity source. DCD (15 December 2025) reports groundbreaking as part of Oracle/OpenAI Stargate, more than $25 billion, and 5,000-plus construction and operations jobs. Customer/Stargate is not the operator identity; Vantage remains the operator.
TDLR filings use Abilene mailing addresses in Shackelford County, including TABS2026024091 (TX304, 246 PR 1604 BLDG 4, $1,315,000,000, 453,385 sf, 26 September 2025–18 May 2027) and TABS2026024068 (TX3 BLDG 1). Those are building-permit layers, not campus IT in service. Epoch AI lists Shackelford 0 current / 2.0 GW projected versus Vantage’s 1.4 GW; keep both labeled. VoltaGrid/on-site gas microgrid reporting is generation and interconnection, not IT load. Texas Dispatch (30 June 2026) said the first hall was nearing power-on against the 2H 2026 target; that is trade status, not a verified saleable block.
Keep this campus off Crusoe/OpenAI Abilene and off Vantage San Antonio TX11/TX12. Do not publish 1.4 GW, 2.0 GW, $25 billion, or 3.7 million square feet as current saleable IT. Preserve Announced / 0 MW.
Questions
Is Frontier in Abilene?
TYPE3’s map data says Abilene. Vantage and TDLR place the campus in Shackelford County, near Abilene. Keep city versus county labeled.
Is 1.4 GW operating?
No. It is Vantage’s planned critical-IT campus figure. First-hall delivery is dated 2H 2026. TYPE3’s map data is 0 MW.
Who is the operator: Vantage or OpenAI?
Vantage is the operator. Oracle/OpenAI Stargate is a tenant-program association in Vantage and DCD copy.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.